Location: Minneapolis, MN
Contract Type: Design-Assist
Owner: The City of Minneapolis
With a capacity of 20,500 people, the arena contains 702 club seats and 68 suites. MMC was responsible for the complete mechanical system installation on this project. MMC self-performed the plumbing, HVAC piping and sheet metal. MMC was responsible for temperature controls and fire protection subcontractors. MMC was engaged early in the project and worked closely with Gausman & Moore in a design-assist capacity.